The building takes its shape according to its different recesses or projections, depending on the terraces or the access which is located under a 3.60 m overhang.
Offset volumes
The façade, made of prefabricated elements, allows for individual control of the relationship to natural light, city sounds and temperature. This façade combines the two required building uses: offices on two floors and apartments on the top floor. With its regular openings, the office interior, made using traditional materials (oak, aluminium and glass), allows for visual interaction and forges visual links, both between employees and with the outside world.
The construction was completed in just 14 months, due to the prefabrication of elements and active slabs, which made it possible to integrate as many technical elements into the concrete as possible and created significant time savings in the finishing work.