CCHE features in a press review by Le Temps magazine, focusing on the development of ‘The Hive’ campus in Meyrin. The article traces the gradual transformation of this former industrial site into a mixed-use campus, with several buildings already completed or under construction, and further development potential estimated at between 14,000 and 20,000 m².
Commissioned by HIAG, CCHE was involved from the earliest stages of the project to develop an overall vision for the site and define its potential for development.
CCHE was thus involved at every level (urban planning, architecture, landscape architecture, interior architecture, design, delivery, parametric design) of the entire campus, developing a comprehensive vision of the site to ensure the project’s coherence and harmonious development.
Overview of The Hive campus