Currently under construction, the Suettaz district in Nyon will have four new buildings in a green environment by 2027.
The future eco-neighbourhood, which complies with Minergie-P-ECO standards, will create pedestrian areas and avoid traffic. Play, meeting, leisure and walking areas will be distributed around the buildings and courtyards. The future homes will be spacious and comfortable, allowing tenants to enjoy all the modern comforts. The link between interior and outdoor space will also be encouraged, as each flat will have at least one balcony, loggia or terrace.
The construction project will be carried out in four successive phases so that tenants from the previous buildings can gradually move to the new. Great care has been taken by the owners to support and communicate with the tenants to minimise the impact of the works.
The ventilated facades of the B2 building have now been installed. Made of folded sheet metal, they give the Suettaz district its identity.
The building also has photovoltaic panels on the roof.
At the same time, this month marks the end of the structural work on building A1, which will now be ready for the exterior joinery and the start of the plastering.
On building B2, the teams are preparing the supports for the ventilated facade, waterproofing the roof and preparing the interior courtyard on the 1st floor. In the flats, the partitions and screeds are being installed.
At the same time, work is under way on the SS-2 and SS-1 basements in building A1.
History :
Quartier de la Suettaz in Nyon: Site monitoring - 1st phases – June 2023
The installation of the windows in the B2 building is under way, and the building will soon be ready for the crossbeams for the glazed façade on the ground floor.
On building A1, work is under way on the invert and -2 basement walls.
Quartier de la Suettaz in Nyon: Site monitoring - 1st phases – April 2023
The B2 building is raising, with the beginning of the superstructure installation and the delivery of the first prototypes of the building's façade. At the same time, the earthworks and the excavation of the A1 building will be completed.
Quartier de la Suettaz in Nyon: site monitoring - 1st phases – February 2023
As part of the deconstruction of the first stage, the concrete crunching of the buried part of the Tattes d'oie is currently underway, with the structural work of the B2 infrastructure in parallel.
Quartier de la Suettaz in Nyon: Site monitoring - 1st phases – January 2023
The first stage, methodical demolition, is continuing with the construction of the B2 building in parallel.
Quartier de la Suettaz in Nyon: Site monitoring - 1st phases — December 2022
Start of preparatory works and deconstruction of the Tattes d'oie building bar through the disassociation stage between the inhabited part and the unoccupied balance. At the same time, special works and earthworks are underway on building B2, the first of the four new buildings.