The various elements of the school and public swimming pool of the Marly Innovation Center are taking shape. At the end of this year, the concreting of the large diving board by the SACAC SA company is a concrete sign of the progress of the building site.
The aquatic centre includes a 25-metre swimming pool, a diving pool, a movable-bottom training pool, a massage pool and water games.
CCHE is involved in this project in close collaboration with the Magizan office.
The volume of the concrete diving boards corresponds to 5.5 m3 (3m platform, 1m diving board and training bench), and the moulds represent 3'336 kg of steel (3m platform and 1m diving board).